SupplyAgent

Robot sensor mount and harness prototype

Global Sourcing Report

Confidential sourcing decision

Prepared for Stride Robotics

Scope: supplier discovery, RFQ comparison, risk analysis, dual-source recommendation, and QC plan for Robotics.

Decision memo

Executive sourcing decision

report ready

Primary

Rack frame: Hanoi Robotics Machining

Secondary

Cooling/manifold: Pending

Backup

Domestic validation: Ohio Rapid Sheet Metal

Current blocker

Buyer must confirm landed-cost assumptions, inspection criteria, and first-touch attachment approval.

Next action

Approve RFQ clarification questions before sample commitment.

Executive summary

Stride Robotics should proceed with Hanoi Robotics Machining for the next sample quote step while maintaining regional supplier optionality across Vietnam, Malaysia, Mexico, United States. The current ranking balances capability fit, price, lead time, compliance, region risk, logistics risk, communication quality, trust, and scalability.

Quote Comparison

SupplierCountry/RegionUnit priceToolingMOQLead timeIncotermPayment termsTariff/Import RiskLogistics RiskGeopolitical RiskDual-source FitCertificationsRisksScoreRecommendation
Hanoi Robotics MachiningVietnam$13.10$455018 daysFCA Hanoi100% sample, 50/50 productionlowmediumlowprimaryISO 9001
Connector standard missingNo IP rating requirement confirmed
100/100Recommended for prototype mechanical parts.

Supplier Shortlist

Hanoi Robotics Machining is the current rack-frame primary. should remain the cooling/manifold option, while a domestic supplier stays available for prototype validation and regional resilience.

Regional Options

Preferred regions: Vietnam, Malaysia, Mexico, United States. Excluded regions: none. Priority: fastest prototype. Dual-source required: no.

Open Questions

  • - Part type: actuator, chassis, sensor mount, gearbox, harness, PCB?
  • - Torque or load requirement?
  • - Tolerance and material?
  • - IP rating?
  • - Operating temperature?
  • - Confirm sourcing-critical detail for Actuator cable harness: Connector standard still missing.

Risk Analysis

  • - Connector standard missing
  • - No IP rating requirement confirmed

Recommended Sourcing Strategy

Use the highest-scoring supplier for sample execution while collecting landed-cost and logistics assumptions from at least one alternate manufacturing region.

Dual-Source Recommendation

Keep one cost-competitive source and one lower-risk regional backup until sample QC, packaging, and import assumptions are verified.

Methodology

Suppliers were discovered from seed CRM data, marketplace/channel research, directory-style sources, and capability matching. Quotes were normalized by unit price, MOQ, lead time, payment terms, compliance, communication quality, regional risk, logistics risk, and scalability.

QC Plan

Require first-article measurements, finish photos, packaging proof, certification evidence, and video/photo inspection before release to shipment.

Next Steps

  • - Day 0: Resolve missing technical questions and confirm RFQ package.
  • - Day 1: Send controlled RFQ to matched global suppliers.
  • - Day 2: Normalize quotes and negotiate unclear fields.
  • - Day 3-5: Select primary and backup source after landed-cost, logistics, and QC review.