SupplyAgent
Roboticsquotes receivedStride Robotics

Robot sensor mount and harness prototype

CNC aluminum sensor mounts, cable harnesses, black finish, prototype speed prioritized over lowest price.

Due date

Apr 23

Stage

Risk

Top score

100/100

Top risk

Connector standard mis

Suppliers discovered

120

Suppliers contacted

15

Responses received

7

Quotes received

1

Decision memo

Recommended sourcing strategy

120 discovered · 15 contacted · 7 responded · 4 quotes

Primary

Hanoi Robotics Machining

Secondary

Taichung Thermal Systems for cooling subassembly optionality

Backup

Ohio Rapid Sheet Metal for domestic prototype validation

Current blocker

Landed-cost assumptions and final load-rating evidence are missing.

Next action

Ask suppliers for freight, packaging, Incoterm, tariff/import, and certification clarification.

Current task

Generate recommendation report

Stride Robotics should proceed with Hanoi Robotics Machining for the next sample quote step while maintaining regional supplier optionality across Vietnam, Malaysia, Mexico, United States. The current ranking balances capability fit, price, lead time, compliance, region risk, logistics risk, communication quality, trust, and scalability.

Connector standard missing

Customer

Alex Kim

Destination

Canada

Stage

prototype

Target lead time

2-3 weeks

Target price

Under $35 per assembly

Priority

fastest prototype

Dual-source

optional

Recommended supplier

Hanoi Robotics Machining

Files

sensor_mount_step.zip, harness_pinout.csv

Risk Scoring Agent

Evaluates candidate and quote risk across factory evidence, compliance, tariff/import exposure, logistics, regional dependency, IP exposure, and prototype-to-production fit.

84%

Assumptions

  • - Supplier data is seed-backed until live enrichment is connected.
  • - Scores use default manufacturing sourcing weights.

Missing info

  • - Landed-cost assumptions
  • - Final load-rating certificate
  • - Packaging dimensions

Recommended next action

Confirm landed cost and promote one alternate region into the dual-source shortlist.

Agent activity

Today

Risk analysis completed

Region, logistics, tariff/import, and single-region dependency risks scored.

Today

Quote normalized

1 supplier quotes parsed into comparable line items.

Yesterday

RFQ generated

Controlled first-touch RFQ prepared for global supplier outreach.

Yesterday

Supplier candidates imported

Discovery candidates added from search, directories, referrals, and marketplace research.

2026-04-22

Sourcing brief created

BOM/spec files attached and missing questions identified.